Underground infrastructure / Engineering / Execution

Engineeringbelow thesurface.

Acuity StoneDrill delivers precision-driven underground infrastructure solutions across telecom, fibre and energy infrastructure.

HDD / 01 · Route visualisation
  1. ENT
  2. PLT
  3. RMG
  4. PBK
  5. EXT

01Who we are

Built from the ground up.

Acuity StoneDrill Private Limited was established in 2022 with a focus on infrastructure execution and underground engineering.

Established
2022
Base
Bhopal
Sectors
Telecom · Energy
Infrastructure
Underground

Underground system

From telecom and optical fibre routes to gas infrastructure, our work happens where it matters most and is seen least — beneath roads, junctions and the services already in the ground.

Company profile
Horizontal directional drilling rig set up at the roadside with traffic passing
Fig. 02Bore section · NTS

A product pipe or duct installed in a reamed bore, with depth of cover maintained beneath the surface.

03Signature method · HDD / 01

We build the route without breaking the surface.

A steered bore passes beneath the road and the services already in the ground. The duct is pulled into place — and the road above stays open to traffic.

Typical horizontal directional drilling crossingCross-section of a road crossing: from the entry pit the rig drills a pilot bore beneath the road and existing services to the exit pit, the bore is reamed, and the product duct is pulled back. The road surface is never opened.ROAD REMAINS OPENEXISTING SERVICESDEPTH OF COVERθ ENTRYθ EXITCROSSING LENGTHR01 ENTRY PIT02 PILOT BORE03 REAMING04 PULLBACK05 EXIT PITACUITY STONEDRILLHDD / 01 · TYPICAL CROSSINGSCALE: NOT TO SCALESHEET 01 / ILLUSTRATIVE
  1. 01Entry pit

    The rig sets the drill string into the ground at a shallow entry angle.

  2. 02Pilot Bore

    A steerable drill head traces the planned profile beneath the obstacle.

  3. 03Reaming

    The bore is enlarged to the diameter the product requires.

  4. 04Pullback

    Duct or pipe is drawn back through the bore behind the reamer.

  5. 05Exit pit

    The duct arrives at the exit pit. The surface above was never opened.

04Engineering process

From survey to handover.

01

SRV

Survey

Route walk-down, utility locating and a read of the ground along the proposed alignment.

02

PLN

Planning

Bore profile, entry and exit positions, crossings and method — fixed before mobilisation.

03

PLT

Pilot Drilling

A steerable pilot bore follows the planned profile, tracked and corrected as it advances.

04

RMG

Reaming

The pilot hole is opened up in controlled passes to suit the product being installed.

05

PBK

Pullback

Pipe or duct is pulled back through the reamed bore, from exit to entry.

06

TST

Testing

The installed product is checked and tested against specification before closure.

07

HND

Handover

Pits closed, surfaces restored and records handed over with the route.

05Selected project experience

Work in the field.

Telecom / OFC work for Vodafone Idea (VIL) executed through DEPL, including a 47.6 km OFC route between Dhaulapur, Rajakhera and Shamasabad, and current gas infrastructure work executed through M/s Five Star Engineers for THINK Gas.

View project: Telecom Infrastructure Project — Executed through Dinesh Engineers Limited (DEPL) for Vodafone Idea Limited (VIL).
Two reels of orange duct on a trailer beside a highway fibre route
Representative image

01 / Telecom / OFC Infrastructure

Telecom Infrastructure Project

Executed through Dinesh Engineers Limited (DEPL) for Vodafone Idea Limited (VIL)

A 47.6 km OFC route between Dhaulapur, Rajakhera and Shamasabad for Vodafone Idea Limited (VIL), executed through Dinesh Engineers Limited (DEPL).

Executed for
Vodafone Idea Limited (VIL)
Executed through
Dinesh Engineers Limited (DEPL)
Sector
Telecom / OFC Infrastructure
Location
Dhaulapur – Rajakhera – Shamasabad route
Route length
47.6 km
Scope
Optical fibre cable (OFC) installation along the route, with the associated duct work.
Year
2024–25
Status
Completed
View project: Gas Infrastructure Project — Executed through M/s Five Star Engineers for THINK Gas.
Coated gas pipeline lying in a long excavated trench with construction machinery beyond
Representative image

02 / Gas Infrastructure

Gas Infrastructure Project

Executed through M/s Five Star Engineers for THINK Gas

Gas infrastructure work executed through M/s Five Star Engineers for THINK Gas. A detailed project profile will be published soon.

Executed for
THINK Gas
Executed through
M/s Five Star Engineers
Sector
Gas Infrastructure
Location
Location to be published
Scope
Detailed project profile coming soon
Year
To be published
Status
Ongoing

06Field

Built where conditions change.

Live roads, congested corridors, night shifts and changing ground. Underground work is decided in the field — by the people who are there.

  • Night-time road works with a backhoe loader, road-closed signage and crew in high-visibility clothing
    Fig. 01Night works — live road, managed traffic
  • Close-up of a pipeline joint being welded, with sparks, in the field
    Fig. 02Pipeline joint, made in the field
  • Two surveyors in hard hats and orange vests surveying a city road with a total station
    Fig. 03Route survey on a city road
  • Technician splicing optical fibre with a fusion splicer on site
    Fig. 04Fibre splicing on site
  • Tracked horizontal directional drilling machine positioned on a busy street
    Fig. 05Rig set up at the roadside
  • Top-down view of a yellow gas pipe and fittings running along the base of a trench
    Fig. 06Gas pipe and fittings in trench

Representative imagery · Acuity StoneDrill site photography coming soon

07Project ecosystem

Worked across.

Telecom, fibre and gas infrastructure work across these organisations — from our first OFC routes to today's energy work.

  • 01

    DEPL

    Telecom · Delivered

  • 02

    Vodafone Idea

    Telecom · Delivered

  • 03

    Five Star Engineers

    Gas infrastructure · Current

  • 04

    THINK Gas

    Gas infrastructure · Current

Names identify organisations within our project experience; they do not imply a direct client contract or endorsement. All names and trademarks belong to their respective owners.

08Equipment

Machines that make it possible.

Initial equipment list — HDD rigs, excavation, testing and logistics. Each machine is being confirmed individually; specifications and photographs will be updated as entries are verified. Images are representative.

Equipment overview
Side profile of a horizontal directional drilling rig with its rod rack and operator cabRepresentative image

Horizontal directional drilling rigs for pilot boring, reaming and pullback beneath roads, rail and services.

01 / Trenchless · 05 listed

HDD rigs

  1. 01

    GOODENG GD-420LS

    42-ton class

    Long-distance fibre crossings and hard rock applications

  2. 02

    GOODENG GD-360LS

    36-ton

    Urban utility corridors and road / rail crossings

  3. 03

    Drillto 80 Ton

    80-ton pulling capacity

    Heavy-duty large diameter bore work

  4. 04

    Drillto 18/20 Ton

    Compact

    Confined urban routes

  5. 05

    Apollo A800 HDD

    Mid-range

    Versatile telecom duct installation

09Safety

Safety is part of the engineering.

Field crew in hard hats and high-visibility vests working with a total station on a road

Underground work is unforgiving. Safety is planned into every route — before the first bore, not after it.

  • 01Utility locating before drilling

    Existing services are identified and marked before ground is broken.

  • 02PPE on every crew

    Appropriate personal protective equipment for every person on site.

  • 03Site inspection & supervision

    Pre-start checks and supervised execution throughout the work.

  • 04Traffic & public safety

    Barricading, signage and traffic management around live roads.

  • 05Permits & documentation

    Work permits, method statements and records kept in order.

  • 06Equipment checks

    Machines and tools inspected before they are put to work.

10Company story

From connectivity to energy — and what comes next.

Incorporated in Bhopal in 2022. Each chapter has taken the work further underground — from fibre routes to energy infrastructure.

  1. 2022

    Established2022

    Acuity StoneDrill established

    Incorporated in Bhopal with a focus on infrastructure execution and underground engineering.

  2. OFC

    Telecom / OFCDelivered

    Digital connectivity

    Telecom and optical fibre execution experience within the DEPL / Vodafone Idea ecosystem.

  3. NOW

    CurrentOngoing

    Energy infrastructure

    Gas infrastructure work for THINK Gas, executed through M/s Five Star Engineers.

  4. NEXT

    NextAhead

    Broader underground capability

    Expanding our underground infrastructure capabilities across telecom, energy and utility corridors.

Start a project · Route / Entry / Exit

Have a project below the surface?

Planning a crossing, a fibre route or a gas network extension? Share the route, the constraints and the timeline — we will come back with how we would approach it.

View through the inside of a large HDPE pipe towards light and two silhouetted figures

The next chapter→