01
SRV
Survey
Route walk-down, utility locating and a read of the ground along the proposed alignment.
Underground infrastructure / Engineering / Execution
Acuity StoneDrill delivers precision-driven underground infrastructure solutions across telecom, fibre and energy infrastructure.
01Who we are
Acuity StoneDrill Private Limited was established in 2022 with a focus on infrastructure execution and underground engineering.
Underground system
From telecom and optical fibre routes to gas infrastructure, our work happens where it matters most and is seen least — beneath roads, junctions and the services already in the ground.
Company profile
A product pipe or duct installed in a reamed bore, with depth of cover maintained beneath the surface.
02Capabilities

01 / Horizontal directional drilling
Steerable, trenchless installation of ducts and pipelines beneath roads, services and sensitive ground, with minimal disruption at the surface.

02 / Optical fibre infrastructure
Underground optical fibre cable infrastructure — duct installation, cable laying and associated civil work for telecom networks.

03 / Gas pipeline infrastructure
Execution of underground gas pipeline infrastructure — trenchless crossings, pipe installation and associated works for gas distribution networks.

04 / Underground utility execution
Field execution of underground utility works — ducts, conduits and service routes coordinated around live roads and existing services.
03Signature method · HDD / 01
A steered bore passes beneath the road and the services already in the ground. The duct is pulled into place — and the road above stays open to traffic.
01Entry pit
The rig sets the drill string into the ground at a shallow entry angle.
02Pilot Bore
A steerable drill head traces the planned profile beneath the obstacle.
03Reaming
The bore is enlarged to the diameter the product requires.
04Pullback
Duct or pipe is drawn back through the bore behind the reamer.
05Exit pit
The duct arrives at the exit pit. The surface above was never opened.
04Engineering process
01
SRV
Route walk-down, utility locating and a read of the ground along the proposed alignment.
02
PLN
Bore profile, entry and exit positions, crossings and method — fixed before mobilisation.
03
PLT
A steerable pilot bore follows the planned profile, tracked and corrected as it advances.
04
RMG
The pilot hole is opened up in controlled passes to suit the product being installed.
05
PBK
Pipe or duct is pulled back through the reamed bore, from exit to entry.
06
TST
The installed product is checked and tested against specification before closure.
07
HND
Pits closed, surfaces restored and records handed over with the route.
05Selected project experience
Telecom / OFC work for Vodafone Idea (VIL) executed through DEPL, including a 47.6 km OFC route between Dhaulapur, Rajakhera and Shamasabad, and current gas infrastructure work executed through M/s Five Star Engineers for THINK Gas.

01 / Telecom / OFC Infrastructure
Executed through Dinesh Engineers Limited (DEPL) for Vodafone Idea Limited (VIL)
A 47.6 km OFC route between Dhaulapur, Rajakhera and Shamasabad for Vodafone Idea Limited (VIL), executed through Dinesh Engineers Limited (DEPL).

02 / Gas Infrastructure
Executed through M/s Five Star Engineers for THINK Gas
Gas infrastructure work executed through M/s Five Star Engineers for THINK Gas. A detailed project profile will be published soon.
06Field
Live roads, congested corridors, night shifts and changing ground. Underground work is decided in the field — by the people who are there.






Representative imagery · Acuity StoneDrill site photography coming soon
07Project ecosystem
Telecom, fibre and gas infrastructure work across these organisations — from our first OFC routes to today's energy work.
DEPL
Telecom · Delivered
Vodafone Idea
Telecom · Delivered
Five Star Engineers
Gas infrastructure · Current
THINK Gas
Gas infrastructure · Current
Names identify organisations within our project experience; they do not imply a direct client contract or endorsement. All names and trademarks belong to their respective owners.
08Equipment
Initial equipment list — HDD rigs, excavation, testing and logistics. Each machine is being confirmed individually; specifications and photographs will be updated as entries are verified. Images are representative.
Equipment overview
Representative imageHorizontal directional drilling rigs for pilot boring, reaming and pullback beneath roads, rail and services.
01 / Trenchless · 05 listed
Long-distance fibre crossings and hard rock applications
Urban utility corridors and road / rail crossings
Heavy-duty large diameter bore work
Confined urban routes
Versatile telecom duct installation
09Safety

Underground work is unforgiving. Safety is planned into every route — before the first bore, not after it.
01Utility locating before drilling
Existing services are identified and marked before ground is broken.
02PPE on every crew
Appropriate personal protective equipment for every person on site.
03Site inspection & supervision
Pre-start checks and supervised execution throughout the work.
04Traffic & public safety
Barricading, signage and traffic management around live roads.
05Permits & documentation
Work permits, method statements and records kept in order.
06Equipment checks
Machines and tools inspected before they are put to work.
10Company story
Incorporated in Bhopal in 2022. Each chapter has taken the work further underground — from fibre routes to energy infrastructure.
2022
Established2022
Incorporated in Bhopal with a focus on infrastructure execution and underground engineering.
OFC
Telecom / OFCDelivered
Telecom and optical fibre execution experience within the DEPL / Vodafone Idea ecosystem.
NOW
CurrentOngoing
Gas infrastructure work for THINK Gas, executed through M/s Five Star Engineers.
NEXT
NextAhead
Expanding our underground infrastructure capabilities across telecom, energy and utility corridors.
Start a project · Route / Entry / Exit
Planning a crossing, a fibre route or a gas network extension? Share the route, the constraints and the timeline — we will come back with how we would approach it.
Or write to us

The next chapter→