01Project · Telecom / OFC Infrastructure

Telecom InfrastructureProject

A 47.6 km OFC route between Dhaulapur, Rajakhera and Shamasabad for Vodafone Idea Limited (VIL), executed through Dinesh Engineers Limited (DEPL).

Completed

Executed for · Vodafone Idea Limited (VIL)

Executed through · Dinesh Engineers Limited (DEPL)

01Project record

Executed through Dinesh Engineers Limited (DEPL) for Vodafone Idea Limited (VIL)

Executed for
Vodafone Idea Limited (VIL)
Executed through
Dinesh Engineers Limited (DEPL)
Sector
Telecom / OFC Infrastructure
Location
Dhaulapur – Rajakhera – Shamasabad route
Route length
47.6 km
Scope
Optical fibre cable (OFC) installation along the route, with the associated duct work.
Year
2024–25
Status
Completed
Two reels of orange duct on a trailer beside a highway fibre route
Representative image

A 47.6 km telecom optical fibre (OFC) route between Dhaulapur, Rajakhera and Shamasabad, executed by Acuity StoneDrill through Dinesh Engineers Limited (DEPL) for Vodafone Idea Limited (VIL).

The work covered OFC cable installation along the route, together with the associated duct work.

Start a project · Route / Entry / Exit

Have a project below the surface?

Planning a crossing, a fibre route or a gas network extension? Share the route, the constraints and the timeline — we will come back with how we would approach it.

View through the inside of a large HDPE pipe towards light and two silhouetted figures

The next chapter→