03Gas pipeline infrastructure

Gas PipelineInfrastructure

Execution of underground gas pipeline infrastructure — trenchless crossings, pipe installation and associated works for gas distribution networks.

Capability
Gas
Index
03 / 04
Sectors
GAS · HDD · UTILITY

01Overview

Energy infrastructure, laid with care.

Gas distribution networks run beneath the same streets as everything else. Installing them safely means knowing what is already in the ground and choosing the least disruptive way through it.

Acuity StoneDrill is currently executing gas infrastructure work for THINK Gas through M/s Five Star Engineers.

Our role combines trenchless crossings with field execution — so gas networks reach the places they need to, with the surface disturbed as little as possible.

02Process

How the work runs.

  1. 01

    Survey & locating

    Existing services identified along the proposed pipeline route.

  2. 02

    Method selection

    Trenchless or open-cut chosen per section to suit the ground and site.

  3. 03

    Installation

    Pipe installed by HDD crossing or route works as planned.

  4. 04

    Testing

    Installed sections checked and tested as specified by the client.

  5. 05

    Restoration

    Pits and working areas reinstated, records handed over.

03Applications

Where it is used.

  • 01

    Distribution networks

    Underground pipe installation for gas distribution networks.

  • 02

    Road crossings

    Trenchless crossings beneath roads, junctions and drains.

  • 03

    Congested corridors

    Routes past existing telecom, power and water services.

  • 04

    Service connections

    Underground works associated with network extensions.

04Execution methodology

Controlled from start to finish.

Services awareness
Existing utilities located and protected before and during works.
Pipe handling
Pipe stored, handled and installed to protect its integrity.
Client specifications
Work executed to the client’s standards, drawings and procedures.
Supervision
Field supervision through every stage of installation.
Yellow polyethylene gas pipe with fittings laid in an open trench behind barriers

06Project examples

Related work.

View project: Gas Infrastructure Project — Executed through M/s Five Star Engineers for THINK Gas.
Coated gas pipeline lying in a long excavated trench with construction machinery beyond
Representative image

01 / Gas Infrastructure

Gas Infrastructure Project

Executed through M/s Five Star Engineers for THINK Gas

Gas infrastructure work executed through M/s Five Star Engineers for THINK Gas. A detailed project profile will be published soon.

Executed for
THINK Gas
Executed through
M/s Five Star Engineers
Sector
Gas Infrastructure
Location
Location to be published
Scope
Detailed project profile coming soon
Year
To be published
Status
Ongoing

07FAQ

Questions, answered.

Acuity StoneDrill is currently executing gas infrastructure work for THINK Gas through M/s Five Star Engineers. Detailed project information will be published as it is finalised.

Yes. HDD is widely used to install gas distribution pipes beneath roads, drains and other obstacles, subject to design, ground conditions and the network owner’s specifications.

Work is executed to the specifications, drawings and procedures set by the client and network owner for each project.

Start a project · Route / Entry / Exit

Have a project below the surface?

Planning a crossing, a fibre route or a gas network extension? Share the route, the constraints and the timeline — we will come back with how we would approach it.

View through the inside of a large HDPE pipe towards light and two silhouetted figures

The next chapter→